Date Activities
2 weeks before woil preparation Soil analysis (Nutrient & Disease)
0 Sowing
1 Sowing preparation (Plow by 7 disc tractor)
7 Till fine by Rotary Tiller
7 Sow Marigold seeds
7 Set up bed by waling tractor

Bed preparation

8 Apply soil improvement material + Basal fertilizer N:P:K 15-0-0 apply 30 gm. per sq.m.
8 Mix soil improvement material with soil and bedding process
Irrigation system
10 Drips : install drip tape and testing irrigation system
11 Cover bed by plastic mulching
12 Pierce holes for planting
Transplanting
15 Transplant plugs directly to beds
15 Apply Basal fertilizer N:P:K 15-0-0 apply 30 gm. per sq.m.
Pest control : Prevention
16 Weed : spray pre-emergency herbicide in between beds
17 Insect : install 1 yellow sticky trap per 4×4 sq.m. area with 30-40 cm. height
21 Apply N:P:K 15-15-15 (3 gm./jplant)
28 Apply N:P:K 15-15-15 (3 gm./plant)
Field management
35 Weed control : Manual by spraying post emergency herbicide
36 Apply fertilizer granule rate 5 gm./plant

Top dress fertilizer 14-14-21 N:P:K

42 2nd Top dress fertilizer 14-14-21 (5 gm./plant)
Once a week after 40 days Apply fertigation rate 750 ppmN of N:P:K 15-0-0
Once a week after 40 days Spray multimicro nutrients once a week (B, Zn, Ca, Fe, …etc.)
49 Apply N:P:K 8-24-24 (5 gm./plant)
Pest control : Control & Eradicate according to monitor
Every week Spray insecticide
Every week Spray Fungicide
Every week Spray NPV (Nuclear Polyhedroses Virus)
Bio control – grower chooses
Every week Spray Trichoderma
Every week Spray Bacillus subtilis
Flower date
70 Floret opening date : one flower per plant, 50% per plot
Harvesting
75 First harvesting date
78 Second harvesting : 2-3 days after first harvest